Tuesday, January 3, 2012

Chesapeake permits two more wells at Mitchell Ranch

Chesapeake Energy has permitted two additional wells at Lynden Energy's Mitchell Ranch property.  The S250HR horizontal sidetrack well was permitted on 12/23/11 and appears to be in the same proximity as the original S250H well.  An amendment to S250H was permitted on 11/29 and looks to be a permit to shorten the original horizontal run.

The S450H horizontal sidetrack well was permitted on 12/27/11 and is indicated to be a new injection well.

Chesapeake is continuing to permit new wells at Mitchell Ranch and hopefully results will be released soon.

No comments:

Post a Comment